Engineering firms
From the test hole to the drawing without retyping.
Percolation tests and deep test pits feed straight into the septic design. Percolation Manager takes the field data and the pit logs and produces the soil test sheets and the health district memorandum — with the rules applied the same way on every job.
PERCOLATION TEST HOLE LOG
PERCOLATION TESTS CONDUCTED 10/02/2026
PERC HOLE P-12.2
PRESOAK DATE: 10/01/2026
| TIME | DEPTH (INCHES) | DROP (INCHES) | INTERVAL (MINUTES) | RATE (MIN./INCH) |
|---|---|---|---|---|
| 10:05 | 15.25" | |||
| 10:15 | 16.50" | 1.25" | 10 | 8.00 |
| 10:25 | 17.65" | 1.15" | 10 | 8.70 |
| 10:35 | 18.70" | 1.05" | 10 | 9.52 |
| 10:45 | 19.70" | 1.00" | 10 | 10.00 |
| 10:55 | 20.65" | 0.95" | 10 | 10.53 |
FINAL PERCOLATION RATE = 10.1–20.0
MLSS REQUIREMENTS
- DESIGN FACTORS:
- NUMBER OF BEDROOMS
- 3
- DESIGN PERCOLATION RATE
- 10.1–20.0
- LIMITING FACTORS:
- DEPTH TO LEDGE (INCHES)
- 62*
- DEPTH TO HARDPAN (INCHES)
- N/R
- DEPTH TO MOTTLING (INCHES)
- 32*
- HYDRAULIC FACTORS:
- HYDRAULIC GRADIENT (% SLOPE)
- 5–10%
- RECEIVING SOIL DEPTH (INCHES)
- 32*
- HYDRAULIC FACTOR (HF)
- 28
- FLOW FACTOR (FF)
- 1.5
- PERCOLATION FACTOR (PF)
- 1.25
- MINIMUM LEACHING SYSTEM SPREAD
- MLSS = HF × FF × PF (FEET)
- 52.50
* AVERAGE DEPTH
Where the time goes
Less transcription, fewer checks of the checks.
Field to office, no retyping
Percometer data arrives as data over USB, saved and verified. The same numbers reach the tables, the drawing and the memorandum.
Software · workingJobs organized by lot
Holes and pits are grouped per lot, one septic system each, across as many field days as the job needed. One project file holds it all.
Software · workingThe design numbers, worked out
Design percolation rate, receiving soil depth, HF, FF, PF, MLSS, required ELA and a leaching product suggestion — per lot, updated as you type.
Software · workingCAD output that respects your template
AutoCAD draws the SOIL TESTS sheets into the template, keeping its layers, styles and blocks. Every size is planned first; nothing overlaps.
Software · workingThe memorandum, written for you
A cover letter and one page per lot, with the pit logs and percolation tables, as a .docx. Word is not needed to produce it.
Software · workingEngineering judgement stays yours
Every value the software works out can be typed over. Typed values print as typed and are marked on screen; one click restores the calculated value.
Software · working- ✓Sources
- ✓Test Data
- ✓Project Details
- 4Lots
- 5Test Tables
Lots
One septic system per lot: pits, design, and the MLSS table as it will be drawn.
- Design percolation rate
- 10.1–20.0
- Number of bedrooms
- 3
- Receiving soil depth (in)
- 32*
- Hydraulic factor (HF)
- 28
- Flow factor (FF)
- 1.5
- Percolation factor (PF)
- 1.25
- MLSS = HF × FF × PF (ft)
- 52.50
Per lot
Pits in, MLSS out, as it will be drawn.
Type each lot's deep test pits and anything about its design that differs from the project. The MLSS table, required ELA, suggested product and the notes box update as you go — exactly as they will appear on the sheet.
- Receiving soil depth averaged over the usable pits' first restrictive condition
- A hydraulic gradient range uses its low end, conservatively
- Over 60 in.: MLSS not required. Under 18 in.: flagged for a P.E.
Deliverables
The two documents the job needs.
Six lots to a sheet, every size planned before it is drawn. If your office has its own sheet standards, tell us about them.
PERCOLATION TEST HOLE LOG
PERCOLATION TESTS CONDUCTED 10/02/2026
PERC HOLE P-12.2
PRESOAK DATE: 10/01/2026
| TIME | DEPTH (INCHES) | DROP (INCHES) | INTERVAL (MINUTES) | RATE (MIN./INCH) |
|---|---|---|---|---|
| 10:05 | 15.25" | |||
| 10:15 | 16.50" | 1.25" | 10 | 8.00 |
| 10:25 | 17.65" | 1.15" | 10 | 8.70 |
| 10:35 | 18.70" | 1.05" | 10 | 9.52 |
| 10:45 | 19.70" | 1.00" | 10 | 10.00 |
| 10:55 | 20.65" | 0.95" | 10 | 10.53 |
FINAL PERCOLATION RATE = 10.1–20.0
MLSS REQUIREMENTS
- DESIGN FACTORS:
- NUMBER OF BEDROOMS
- 3
- DESIGN PERCOLATION RATE
- 10.1–20.0
- LIMITING FACTORS:
- DEPTH TO LEDGE (INCHES)
- 62*
- DEPTH TO HARDPAN (INCHES)
- N/R
- DEPTH TO MOTTLING (INCHES)
- 32*
- HYDRAULIC FACTORS:
- HYDRAULIC GRADIENT (% SLOPE)
- 5–10%
- RECEIVING SOIL DEPTH (INCHES)
- 32*
- HYDRAULIC FACTOR (HF)
- 28
- FLOW FACTOR (FF)
- 1.5
- PERCOLATION FACTOR (PF)
- 1.25
- MINIMUM LEACHING SYSTEM SPREAD
- MLSS = HF × FF × PF (FEET)
- 52.50
* AVERAGE DEPTH
MEMORANDUM
LOT 12
| 10:05 | 15.25" | |||
| 10:15 | 16.50" | 1.25" | 10 | 8.00 |
| 10:25 | 17.65" | 1.15" | 10 | 8.70 |
| 10:35 | 18.70" | 1.05" | 10 | 9.52 |
| 10:45 | 19.70" | 1.00" | 10 | 10.00 |
Next step
Bring a real job to the demo.
The quickest way to judge it is on a job you know. A demonstration takes your kind of percolation data through to the drawing and the memorandum, and shows where the system fits your office.